Decision
35
G.R. No. 215988
The clear wording of this Memorandum belies private respondents'
assertion that no separate environmental compliance certificate was needed
prior to the tree removal and transplanting operations.
The necessity of a separate environmental compliance certificate is
evident as the original Environmental Compliance Certificate only
contemplated the removal of 112 trees for the entire SM Pines Resort
Project. Meanwhile, the amended Environmental Compliance Certificate
issued for the Expansion Project considered the environmental impact of the
"additional parking levels, retail shops[,] and restaurants; and construction of
a new 1,200 m3 /day capacity Sewage Treatment Plant" 152 but did not
account for removing an additional 182 Benguet pine and Alnus trees.
Notably, the plan on the affected trees in the revised Environmental
Performance Report and Management Plan, in support of the application for
an amended environmental compliance certificate, seemed to be a mere
afterthought, as shown by the lack of a solid strategy in place:
H. Impact on Ecological Environment
There are a number of trees and plants of significant value that will be
affected by the construction of the proposed project. The designer is
considering the replanting of these trees to the open areas of the site as part
of the project landscaping. Maximum effort shall be made to save existing
vegetation especially those with economic and ecological importance.
Careful balling out of the roots and relocating the fruit bearing and
premium trees into a suitable pre-identified relocation site is recommended
in order to preserve these species.
Site landscaping shall consist
predominantly of providing suitably shaped final ground surfaces and the
establishment of grass and trees.
Tree planting and vegetation growth on the peripheral boundary will be
done to improve the ecological environment. These strips of vegetation
will also serve as buffer zones. Cutting of trees shall be avoided as much
as possible.
Dust generated during construction stage may affect the nearby vegetation
temporarily. Dust that usually settles on leaf surface results in the
blocking of stomates. The stomates are pores in the epidermis of leaves.
They are channels of gas exchange which is important for the
If dust will be left uncontrolled during
physiological processes.
construction stage, it may result to the blocking of stomates and eventually
to the disruption [of] normal physiological processes of the plants.
In line with the project's principal objective to be environmentally
responsive, all activities from construction to implementation should
prioritize preservation and improvement on all aspects of the existing
natural environment particularly trees, vegetation and other landscape
features.