PPP Project Types
Minimum/Common Safeguards Requirements
- Amount of water to be treated
- Existing use and quality of the water source
- Appropriate water quality standards (e.g. drinking water
standard, etc.)
Adequate consultations / IEC with the surrounding communities on
the identified water source especially for surface water, so as to
protect headwaters from contamination caused by dumping of
wastes, run-off from farm operations, etc.
Consideration of the existing land-use and adjacent communities
on the specific design and layout of the septage management
facility with special consideration on odor management
Sludge management system for septage management projects.
5. Solid Waste Management
Project
Input to the selection of the specific project site:
- Type of facility being considered and the type and projected
amount of wastes to be handled, including among of waste
generated daily and quality of the waste
- Space requirement for the specific type of facility and
corresponding buffer requirements for adjacent communities
- Minimal disruption / inconvenience to existing users of access
routes
- Avoid infringing on critical habitats and areas with significant
biodiversity (e.g. wetlands)
- Site should not be prone to flooding
- For sanitary landfills, the soil should be relatively impermeable
and have a high capability of containing contaminants (e.g. clay),
the bottom of the landfill should be significantly above the water
table and the site should be away from groundwater recharge
area sources and not draining to surface waters
- Land use compatibility
- Involvement of the community is recommended
For sanitary landfills, use of appropriate liner (e.g. clay, synthetic
depending on the waste characterization and geological structure)
Maintain erosion and surface drainage control measures to avoid
runoff to nearby bodies of water and avoid creating stagnant
waters that could breed disease carriers
Proper management of odor
Traffic management plan for truck routes
Management measures in cases of storms so as to contain waste
materials
6. Renewable Energy
Projects (solar, wind,
waste to energy, hydro)
Input to the selection of project site for wind mills and solar power
facilities:
- Adequate consultations on competing land-uses in proposed
project sites as windmills solar facilities take-up a lot of space
- Renewable energy sites identified by the Department of Energy