B.
PROCEDURE FOR THE VERIFICATION OF PREVIOUSLY APPROVED
WELL AS THOSE PENDING WITH THE DENR UPON THE PASSAGE OF IPRA.
SURVEYS AS
Section 2. General Provision. All survey plans submitted in connection with ancestral
land/domain claims previously approved for registration or titling purposes by the DENR or LRA
(formerly Land Registration Commission), including those approved by NCIP First Commission
but were not issued with either CADT or CALT, shall be reviewed and verified by ADO. On the
other hand, unapproved survey plans submitted for the same purpose are not subject to such
review and verification, and the same shall be governed by Part II, Rule II, Section 1 of this Rules.
The procedure for review and verification of previously approved survey plans are as follows:
a. Review of Survey Returns.The review of survey returns shall be done to determine
the correctness and completeness of the approved data or record on hand and to ascertain the
availability of the necessary data that can be used as reference for the conduct of verification
survey.
In cases where delineation survey was conducted using GPS instruments, review of GPS data
shall be conducted by examination of the GPS electronic files and other GPS supporting
documents.
In the absence of data necessary for verification, research shall be undertaken for the purpose of
gathering pertinent documents.
b. Verification Survey.Only NCIP geodetic engineers and/or accredited geodetic
engineers shall conduct verification survey. This verification shall include, among others, actual
inspection as to the presence of corner monuments and survey/observation of strategic corners
to determine if indeed an actual survey was conducted and to test the positions of corner
stones/monuments. As such, the Geodetic Engineer shall conduct test traverse, point
positioning, and such other activities provided under Sec. 621 to 625 (Verification Survey) of
DAO 98-12.
Ground verification shall likewise be undertaken and this involves consultation between and
among the Geodetic Engineer who conducted the first survey, the community-claimant, and
other concerned entities.
c. Preparation of Reports and Recommendations. Within twenty (20) days from the
completion of the ground verification survey, the NCIP geodetic engineer and/or accredited
geodetic engineer directed/contracted to conduct verification survey shall prepare and submit a
report to ADO detailing his/her observations and findings on the review of survey returns, and
the result of his/her ground verification survey including such specific recommendations as to
the necessity of conducting resurvey, amendment survey or correction, as the case may be.
d. Conduct of Re-Survey or Amendment Survey. Any re-survey or amendment survey
shall comply with the requirements provided in Part II, Rule II, Section 2 of this Rules.
Section 3. Defective Surveys for Want of Authority. Defective surveys for want of authority
refers to past surveys conducted at the instance of ICC/IP claimant, undertaken by private
geodetic engineers, but without the required authority from the NCIP or the DENR. Defective
Surveys for want of authority shall be verified by ADO following the process in Part II, Rule II,
Section 2, and if found to be in order, the defect for want of authority shall be cured through the
approval of the plan by ADO. Otherwise, Part II, Rule II, Section 1 of this rule shall be applied.
RULE III
STANDARDS FOR DELINEATION OF ANCESTRAL LANDS/DOMAINS
Section 1. Methods of Delineation. The delineation of ancestral domains/lands shall be
conducted using conventional survey methods, GPS or a combination of both. Delineation of
ancestral waters shall be done through GPS; for smaller areas, conventional methods may
likewise be used.
Page 21 of 26
Revised Omnibus Rules on Delineation and Recognition of Ancestral Domains and Lands of 2012
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents