PPP Project Types
Minimum/Common Safeguards Requirements
Livelihood impact assessment and management especially for
vulnerable sectors and adequate compensation and/or
resettlement of physically and economically displaced people
3. Construction of Buildings
with O&M
Input to site selection
- Baseline data on the actual use / land use plan, environmental
sensitivity, current environmental issues (especially for tourism
projects) and geologic hazards in the proposed project site
alternatives
- Space requirement, access and compatibility with adjacent land
uses
- For schools, hospitals and other similar facilities, projected
number of users and accessibility (especially for vulnerable
sectors) shall be considered
Consideration in the project design of the geologic and other
natural hazards including climate change risks in the proposed
project site
Drainage study and management plan to prevent flooding hazards
that may be caused by the project or could affect the project
Optimal design for the location of waste bins and temporary
storage for solid wastes based on a detailed assessment of the
projected generation and collection system
Optimal design for the sewage system based on a detailed
assessment of the projected generation and the existing common
sewage system in the project area
Adequate parking space allocation considering the assessment of
the projected users and existing local ordinances, if any
Detailed study on the traffic baseline, assessment of impact of the
project on traffic and corresponding management plan
Consideration of energy efficiency (and other green architecture
concepts) and concerns on gender, cultural and vulnerable
sectors, including persons with disabilities, in the design of the
building
4. Water Supply and
Septage Management
Project (Construction,
O&M)
Input to site selection:
- Water quality of the alternative sources of water being
considered
- Availability and competition with existing users for the alternative
sources of water being considered – to be shown in a map or
plan of possible extraction points indicating sustainable yield to
cover the projected demand of the service coverage area
- Water supply and septage needs (current and future projections)
assessment including adequate consultations with stakeholders
- Land use compatibility
Consideration of the following as key design criteria for the water
treatment facility, as may be necessary for water supply projects: